IBM BladeCenter JS12 Problem Determination And Service Manual page 131

Ibm power6 architecture
Table of Contents

Advertisement

Table 19. CA000000 to CA2799FF checkpoints (continued)
v If the system hangs on a progress code, follow the suggested actions in the order in which they are listed in
the Action column until the problem is solved. If an action solves the problem, you can stop performing the
remaining actions.
v See Chapter 3, "Parts listing, Type 7998," on page 235 to determine which components are CRUs and which
components are FRUs.
Progress code
CA00E143
CA00E149
CA00E14C
CA00E14D
CA00E150
CA00E151
CA00E152
CA00E153
Description
The operating system bootlist is being
set from the management module
bootlist
Create boot manager node
Create terminal emulator node
Load boot image
Create host (primary) node
Probing PCI bus
Probing for adapter FCODE; evaluate if
present
End adapter FCODE probing and
evaluation
Action
1. Reboot the blade server.
2. If the problem persists:
a. Go to "Checkout procedure" on page
186.
b. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis
assembly" on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
Go to "Boot problem resolution" on page 193.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
Chapter 2. Diagnostics
117

Advertisement

Table of Contents
loading

Table of Contents