Table 20. D1001xxx to D1xx3FFF dump codes (continued)
v If the system hangs on a progress code, follow the suggested actions in the order in which they are listed in
the Action column until the problem is solved. If an action solves the problem, you can stop performing the
remaining actions.
v See Chapter 3, "Parts listing, Type 7998," on page 235 to determine which components are CRUs and which
components are FRUs.
Progress code
D12B1xxx
D12C1xxx
D12D1xxx
D12E1xxx
D12F1xxx
D1301xxx
D1311xxx
D1321xxx
136
JS12 Type 7998: Problem Determination and Service Guide
Description
Initialize the headers dump time and
serial numbers
Display final SRC to panel
Rmove /core/core.app.time.pid
Remove /core/core.*
Display beginning SRC to panel
Turn off error log capture into dump
Turn on error log capture into dump
Store information about existing core
files
Action
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.