IBM BladeCenter JS12 Problem Determination And Service Manual page 104

Ibm power6 architecture
Table of Contents

Advertisement

Table 16. C1001F00 to C1645300 checkpoints (continued)
v If the system hangs on a progress code, follow the suggested actions in the order in which they are listed in
the Action column until the problem is solved. If an action solves the problem, you can stop performing the
remaining actions.
v See Chapter 3, "Parts listing, Type 7998," on page 235 to determine which components are CRUs and which
components are FRUs.
Progress code
C1001F0D
C1001F0F
C1001FFF
C1009x01
C1009x02
C1009x04
C1009x08
90
JS12 Type 7998: Problem Determination and Service Guide
Description
Pre-standby: discovery completed in
initial transition file
While the blade server displays this
checkpoint, the service processor reads
the system vital product data (VPD). The
service processor must complete reading
the system VPD before the system
displays the next progress code.
Pre-standby: waiting for standby
synchronization from initial transition
file
Pre-standby: completed initial transition
file
Hardware object manager: (HOM): the
cancontinue flag is being cleared
Hardware object manager: (HOM): erase
HOM IPL step in progress
Hardware object manager: (HOM): build
cards IPL step in progress
Hardware object manager: (HOM): build
processors IPL step in progress
Action
1. Wait at least 15 minutes for this checkpoint
to change before you decide that the system
is hung.
Reading the system VPD might take as long
as 15 minutes on systems with maximum
configurations or many disk drives.
2. Go to "Checkout procedure" on page 186.
3. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.

Advertisement

Table of Contents
loading

Table of Contents