IBM BladeCenter JS12 Problem Determination And Service Manual page 153

Ibm power6 architecture
Table of Contents

Advertisement

Table 21. D1xx3y01 to D1xx3yF2 checkpoints (continued)
v If the system hangs on a progress code, follow the suggested actions in the order in which they are listed in
the Action column until the problem is solved. If an action solves the problem, you can stop performing the
remaining actions.
v See Chapter 3, "Parts listing, Type 7998," on page 235 to determine which components are CRUs and which
components are FRUs.
Progress code
D1xx3y07
D1xx3y08
D1xx3y09
D1xx3y0A
D1xx3y0B
D1xx3y0C
D1xx3y0D
D1xx3yF0
Description
(Command Being Processed)
Put SCOM
Send command
Get optimized cache
Get general purpose (GP) register
Processor clean-up
Get JTAG register
Stop clocks without quiescing
Memory collection set-up
Action
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
Chapter 2. Diagnostics
139

Advertisement

Table of Contents
loading

Table of Contents