Table 17. C2001000 to C20082FF checkpoints (continued)
v If the system hangs on a progress code, follow the suggested actions in the order in which they are listed in
the Action column until the problem is solved. If an action solves the problem, you can stop performing the
remaining actions.
v See Chapter 3, "Parts listing, Type 7998," on page 235 to determine which components are CRUs and which
components are FRUs.
Progress code
C2002400
C2002450
C20024FF
C2002500
C20025FF
C2003100
C2003111
Description
Begin powering on slots
Waiting for power on of slots to
complete
End powering on slots
Begin power on VIO slots
End powering on VIO slots
Validating ISL command parameters
Waiting for bus object to become
operational
Action
1. Go to "Recovering the system firmware" on
page 222.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Recovering the system firmware" on
page 222.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Recovering the system firmware" on
page 222.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Recovering the system firmware" on
page 222.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Recovering the system firmware" on
page 222.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Recovering the system firmware" on
page 222.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Recovering the system firmware" on
page 222.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.