Eject Shaft Assembly - Xerox DocuColor 12/DCCS50 Service Manual

Table of Contents

Advertisement

REP 15.2.21 Eject Shaft Assembly
Parts List on
PL 18.19
Removal
To avoid personal injury or shock, disconnect the Finisher cable connector. Switch off
the machine power and disconnect the machine Power Cord.
1.
Switch off the printer power and disconnect the AC Power Cord.
2.
Roll the Finisher away from the Printer.
3.
Remove the Stapler Cover Assembly
4.
Remove the Rear Lower Cover
(REP
5.
Remove the Rear Upper Cover (REP 15.3.7).
6.
Remove the Compiler Cover Assembly
7.
Remove the Eject Clamp Sensor
(REP
8.
Remove the Stacker Offset Home Sensor
9.
Remove the Eject Bracket Assembly
10. Remove the Eject Paddle Motor
(REP
11. Remove the Eject Shaft Assembly
1.
Remove the screws (4) securing the Frame tie plate, and remove the plate.
2.
Remove the E-ring securing the Set Clamp Actuator to Shaft 1, and remove the
Actuator, Pulley, and rear metal bearing.
3.
Remove the E-ring securing the front metal bearing for Shaft 1, and remove the front
bearing.
4.
Remove the E-ring securing the Offset Lever to Shaft 2, and remove the Offset
Lever.
5.
Remove the E-ring securing the Eject Gear to Shaft 2, and remove the Eject Gear.
6.
Remove the screw (1) securing the rear plastic bearing to Shaft 2, and slide the front
bearing off of the Shaft.
7.
Remove the screw (1) securing the front plastic bearing to Shaft 2, and slide the front
bearing off of the Shaft.
8.
Remove Shaft 1 and Shaft 2 (the Eject Shaft Assemblies) as a unit.
Reissue
DocuColor 12/DCCS50
WARNING
(REP
15.3.3).
15.3.15).
(REP
15.2.22).
15.2.17).
(REP
15.2.18).
(REP
15.2.19).
15.2.20).
(Figure
1).
Figure 1 Remove the Eject Shaft Assembly
Replacement
1.
Reinstall the Eject Shaft Assemblies into the Finisher frame.
2.
Slide the front and the rear metal bearings over the ends of Shaft 1.
3.
Position the Compiler Bin so the arms at the front and rear of the Bin line up with Shaft 1.
4.
Slide the front and the rear metal bearings into the bearing cutouts in the Finisher frame,
and through the arms of the Compiler Bin.
5.
use an E-ring to secure the front metal bearing to the front end of Shaft 1.
6.
Slide the Pulley and the Set Clamp Actuator over the rear end of Shaft 1, and use an E-
ring to secure them to the Shaft.
7.
Slide the front plastic bearing onto the front end of Shaft 2, and use the screw (1) to
secure the bearing to the Finisher frame.
1/05
8d-97
Finisher/Sorter
REP 15.2.21

Advertisement

Table of Contents
loading

Table of Contents