Nortel DMS 100 Series Maintenance Manual page 206

Remote switching center multi-access
Hide thumbs Also See for DMS 100 Series:
Table of Contents

Advertisement

6-54 RSC-M card replacement procedures
NTMX75
in an RSC-M
(continued)
7
8
At the cabinet
9
10
297-8223-550 Standard 04.02 November 2000
RCO2 0
A Warm SwAct will be performed after
data sync of active terminals.
Please confirm ("YES", "Y", "NO", or "N"):
If
the system prompts you to confirm a warm SWACT
the system rejects the SWACT
To confirm the command, type:
>YES
and press the Enter key.
Example of a MAP response:
Unit0:
Inact SysB
Unit1:
Act
ISTb
RCO2 0
SwAct Passed
If the MAP response is
SWACT passed
other
A maintenance flag (Mtce) can appear, that indicates system-initiated
maintenance tasks are in progress. When the flag disappears from the status
lines for both RCO2 units you can proceed to the next step.
Place a sign on the active unit that bears the words Active unit-Do not touch.
Do not use magnets or tape to attach this sign.
To manually busy (ManB) the inactive unit, type:
>BSY
INACTIVE
and press the Enter key.
Example of a MAP response:
Mtce
Do
step 8
step 20
Do
step 7
step 21

Advertisement

Table of Contents
loading

Table of Contents