Nortel DMS 100 Series Maintenance Manual page 182

Remote switching center multi-access
Hide thumbs Also See for DMS 100 Series:
Table of Contents

Advertisement

6-30 RSC-M card replacement procedures
NTMX72
in an RSC-M
(continued)
7
8
At the cabinet
9
10
297-8223-550 Standard 04.02 November 2000
RCO2 0
A Warm SwAct will be performed after
data sync of active terminals.
Please confirm ("YES", "Y", "NO", or "N"):
If the system
prompts you to confirm a warm
SWACT
rejects the SWACT
To confirm the command, type:
>YES
and press the Enter key.
Example of a MAP response:
Unit0:
Inact SysB
Unit1:
Act
ISTb
RCO2 0
SwAct Passed
If the MAP response
is SWACT passed
other than listed here
A maintenance flag (Mtce) can appear. A maintenance flag indicates
system-initiated maintenance tasks are in progress. Wait until the flag
disappears from the status lines for both RCO2 units before you proceed to
the next step.
Place a sign with the words Active unit-Do not touch on the active unit. Do
not attach this sign with magnets or tape.
To manually busy (ManB) the inactive unit, type:
>BSY
INACTIVE
and press the Enter key.
Example of a MAP response:
Do
step 7
step 24
Mtce
Do
step 8
step 23

Advertisement

Table of Contents
loading

Table of Contents