Instrument Maintenance
208
Figure 8-3. H2S - SO2 Converter Assembly
Wrap the band heater around the new replacement cartridge and tighten
•
the screws using a high-temperature anti-seize agent such as copper
paste. Make sure to use proper alignment of the heater with respect to
the converter tubes.
Replace the converter assembly, route the cables through the holes in
•
the housing and reconnect them properly. Reconnect the grounding
clamp around the heater leads for safe operation.
Re-attach the tube fittings to the converter and replace the insulation
•
and cover.
Replace the instrument cover and power up the analyzer.
•
Teledyne ML - T101 Operation Manual