3.2. INSTRUMENT LAYOUT

3.2.1. FRONT PANEL

26
4. Inspect the interior of the instrument to make sure all circuit boards and
other components are in good shape and properly seated.
5. Check the connectors of the various internal wiring harnesses and
pneumatic hoses to make sure they are firmly and properly seated.
6. Verify that all of the optional hardware ordered with the unit has been
installed. These are checked on the paperwork (Form 04551)
accompanying the analyzer.
7. VENTILATION CLEARANCE: Whether the analyzer is set up on a bench
or installed into an instrument rack, be sure to leave sufficient ventilation
clearance.
AREA
Various rack mount kits are available for this analyzer.
Instrument layout includes front panel and display, rear panel connectors, and internal
chassis layout.
Figure 3-1 shows the analyzer's front panel layout, followed by a close-up of the display
screen in Figure 3-2, which is described in Table 3-1. The two USB ports on the front
panel are provided for the connection of peripheral devices:
Plug-in mouse (not included) to be used as an alternative to the
touchscreen interface
Thumb drive (not included) to download updates to instruction software
(contact TML Technical Support for information).
Teledyne ML – T101 Operation Manual
MINIMUM REQUIRED CLEARANCE
10 cm / 4 inches
2.5 cm / 1 inch
2.5 cm / 1 inch