Pair Control Solenoid Valve Removal And Installation - Suzuki GSX1300R Manual

Suzuki gsx1300r motorcycle
Hide thumbs Also See for GSX1300R:
Table of Contents

Advertisement

4) Remove the PAIR reed valves (3).
Installation
Install the PAIR reed valve in the reverse order of
removal. Pay attention to the following points:
• Apply thread lock to the bolts and tighten them to the
specified torque.
: Thread lock cement 99000–32110
(THREAD LOCK CEMENT SUPER 1322 or
equivalent)
Tightening torque
PAIR reed valve cover bolt (a): 11 N·m (1.1 kgf-m,
8.0 lb-ft)
(a)
3
I815H1120011-02
(a)
I815H1120012-01
Emission Control Devices:
PAIR Control Solenoid Valve Removal and
Installation
Removal
1) Lift and support the fuel tank. Refer to "Fuel Tank
Removal and Installation in Section 1G (Page 1G-
9)".
2) Remove the air cleaner box. Refer to "Air Cleaner
Box Removal and Installation in Section 1D
(Page 1D-6)".
3) Disconnect the PAIR control solenoid valve coupler
(1) and PAIR hoses (2).
4) Remove the PAIR control solenoid valve (3).
1
Installation
Install the PAIR control solenoid valve in the reverse
order of removal. Pay attention to the following point:
• Connect the PAIR control solenoid valve coupler and
PAIR hoses securely. Refer to "Exhaust Emission
Control System Description (Page 1B-3)".
1B-10
B815H21206004
3
2
I815H1120013-01

Advertisement

Table of Contents
loading

Table of Contents