Suzuki GSX1300R Manual page 235

Suzuki gsx1300r motorcycle
Hide thumbs Also See for GSX1300R:
Table of Contents

Advertisement

Assembly
Reassemble the throttle body in the reverse order of
disassembly. Pay attention to the following points:
• With the secondary throttle valves fully opened, install
the STP sensor (1) and tighten the STP sensor
mounting screw to the specified torque.
NOTE
• Apply thin coat of engine oil to the O-ring.
• Align the secondary throttle shaft end "A"
with the groove "B" of the STP sensor.
• Apply grease to the secondary throttle
shaft end "A" if necessary.
: Grease 99000–25010 (SUZUKI SUPER
GREASE A or equivalent)
Special tool
: 09930–11950 (Torx wrench)
Tightening torque
STP sensor mounting screw: 3.5 N·m (0.35 kgf-
m, 2.5 lb-ft)
"A"
NOTE
• Make sure the secondary throttle valves
smoothly open and close.
• If the STP sensor adjustment is necessary,
refer to "STP Sensor Adjustment in
Section 1C (Page 1C-7)" for STP sensor
setting procedure.
1
"B"
I815H1140034-01
I815H1140035-01
• Apply a thin coat of engine oil to the O-ring and install
the ISC valve to the throttle body.
Tightening torque
ISC valve mounting screw (a): 2 N·m (0.2 kgf-m,
1.5 lb-ft)
• With the throttle valves fully closed, install the TP
sensor (2) and tighten the TP sensor mounting screw
to the specified torque.
CAUTION
!
• Apply thin coat of engine oil to the O-ring.
• Align the throttle shaft end "C" with the
groove "D" of the TP sensor.
• Apply grease to the throttle shaft end "C" if
necessary.
: Grease 99000–25010 (SUZUKI SUPER
GREASE A or equivalent)
Special tool
: 09930–11950 (Torx wrench)
Tightening torque
TP sensor mounting screw: 3.5 N·m (0.35 kgf-m,
2.5 lb-ft)
2
"D"
Engine Mechanical:
1D-14
(a)
I823H1140593-01
"C"
I815H1140036-01

Advertisement

Table of Contents
loading

Table of Contents