Suzuki GSX1300R Manual page 238

Suzuki gsx1300r motorcycle
Hide thumbs Also See for GSX1300R:
Table of Contents

Advertisement

1D-17 Engine Mechanical:
4) Connect the respective vacuum tester hoses to each
vacuum nipple.
5) Set up the SDS tool. (Refer to the SDS operation
manual for further details.)
6) Start the engine.
7) Click "Date monitor".
8) Warm up the engine (Engine coolant temp. more
than 70 °C (158 °F)).
11) Click "ON" button (4) to fix the ISC air volume of four cylinders.
NOTE
When making this synchronization, be sure that the water temperature is within 70 – 100 °C (158 – 212
°F).
"A": Engine speed: Approx 1 150 rpm
9) Click "Active control".
10) Click "ISC air volume control" (3).
I815H1140044-02
I718H1140382-01
"A"
"B"
"B": ISC valve position: Approx. 57 step
3
I815H1140045-01
4
I823H1140589-02

Advertisement

Table of Contents
loading

Table of Contents