Download Print this page

Subaru 2009 IMPREZA Service Manual page 2663

Hide thumbs Also See for 2009 IMPREZA:

Advertisement

POWER ASSISTED SYSTEM (POWER STEERING)
5) Temporarily connect pressure hose and pipe C,
and the return hose and pipe D. Temporarily tight-
en the bolt of clamp E.
(1) Return hose
(2) Pressure hose
(3) Clamp E
(4) Pipe C
(5) Pipe D
6) Tighten clamp E.
Tightening torque:
7.5 N·m (0.76 kgf-m, 5.5 ft-lb)
7) Tighten the pressure hose and pipe C, and the
return hose and pipe D.
Tightening torque:
15 N·m (1.5 kgf-m, 11.1 ft-lb)
Pipe Assembly
(3)
(1)
(2)
(4)
(5)
PS-00847
8) Connect pipes A and B to the four pipe joints of
the gearbox.
Tightening torque:
Refer to "COMPONENT" of "General Descrip-
tion". <Ref. to PS-4, POWER ASSISTED SYS-
TEM, COMPONENT, General Description.>
(1) Pipe A
(2) Pipe B
9) Install the front crossmember support plate and
jack-up plate.
10) Lower the vehicle.
11) Tighten the bolts which hold the hose bracket.
Tightening torque:
10 N·m (1.0 kgf-m, 7.4 ft-lb)
(1) Hose ASSY
(2) Hose bracket
12) Install the air intake duct.
13) Connect the ground cable to battery.
14) Fill with the specified fluid.
CAUTION:
Never start the engine before filling with fluid;
otherwise the vane pump may become seized.
15) Finally, check the clearance between pipes or
hoses as shown in the figure indicated in "General
Diagnostic Table". <Ref. to PS-56, INSPECTION
OF CLEARANCE, INSPECTION, General Diag-
nostic Table.>
PS-40
(1)
(2)
PS-00553
(2)
(1)
PS-00624

Advertisement

loading