Preparing To Power On; Figure 1-2 Cx-Brick Power Switch - Silicon Graphics Origin 3900 User Manual

Table of Contents

Advertisement

Preparing to Power On

007-4653-001
To prepare to power on your server, follow these steps:
1.
Check to ensure that the cabling between the power distribution unit (PDU) and the
wall power-plug receptacle is secure.
2. For each individual brick that you want to power on, make sure that the
(power) switch is set to the
switch is on and power is supplied to the brick, the L1 controller of the brick powers
on. The 12-VDC LED of the brick illuminates green when 12 VDC is present.
Electrical
48 VDC 34.0 A
Power
OK
Rating
12 VDC 20 A
Router
NODE 3
PWR
Inlet Brd
NODE 2
12 V
NODE 1
48 V
NODE 0
X
I
O
2
D
C
B
NUMAlink 1
Port A
A
N3
Figure 1-2
Cx-brick Power Switch
(on) position, as shown in Figure 1-2. When the power
1
Power switch on
O
I
L1
Console
Port
X
X
I
I
O
O
1
3
3
2
1
0
NUMAlink 8
Port H
INT LINK
N2
N1
Powering Server On and Off
D
C
B
NUMAlink 7
Port G
A
NUMAlink 6
N0
PWR
X
I
O
0
Port F
9

Advertisement

Table of Contents
loading

Table of Contents