2: MIS NAS System Hardware Installation
Acclimatization
Preparing to Install
Required Tools
10
If the equipment has been in transit for more than 24 hours to reach the install site, wait 4 to 8
hours for the equipment to acclimate to the data center or lab environment before proceeding with
the installation.
Caution: Failure to let equipment acclimate may cause condensation damage to the equipment.
Uncrate the rack and inspect the shipment for any damage. (Refer to
page
5).
Be aware that the increased weight and size of the tall racks can cause the racks to tip over if the
racks are improperly handled. To minimize your own personal risk of injury, use extra care and
allow extra time when moving racks.
Be sure to evaluate the path you will be moving a rack along before moving the rack. Plan the
move by anticipating any issues and removing any obstacles. Use extra caution during the actual
move and roll the rack on to the data center floor.
The following tools are required:
•
#1 and #2 Phillips screwdrivers,
•
Long #2 Phillips screwdriver,
•
Flat-head screwdriver,
•
Thin-tipped flat-head screwdriver
•
10mm hexagonal socket wrench,
•
A wheeled cart with brakes, sturdy enough to hold the chassis, and on which to work.
Note: Screwdrivers with magnetic tips are recommended.
"Inspecting a Shipment" on
007-5921-001
Need help?
Do you have a question about the NAS MIS and is the answer not in the manual?
Questions and answers