Basic Operating Procedure
c. In the Setup Dialog Box, click the Run Button (to start the monitoring
process for the configured screen, and to start communications).
d. Select the screens using the Overview Screen, and check that each
function is operating normally.
5. Start the Monitor Operation to monitor the Loop Control Unit/Board. (Refer
to Section SECTION 4 Monitor Screen Functions and Operations for de-
tails.)
Perform the following operation.
a. Click the Run Button in the Main Window.
b. Click the screens using the Overview Screen.
Section 1-2
25