1. PLC function will work regardless of the operation mode setting (LDC/SAS).
2. When the PLC function has been completed successfully, Event record is displayed on the
Event window along with the [Automatic Station] showing an automatic execution. Refer to the
figure below.
3. When the SC is stopped, all of the running PLC logic to stop. Stopping of the PLC logic is
displayed in the event record.
4. When the SC in operation is changed from on-line to standby, all of the running PLC logic to
stop once. PLC function is restarted from the new on-line SC.

4.150 Operation in the Bulk Control

How to operate "Bulk Control" is indicated below.
Bulk stop control
1)
Click Stop in the Bulk Control
column.
Confirmation dialog is displayed.
Click OK.