Step 2: Start-up the server panels
Check that the key switch installed in the server panel to turn on the power of the Station
Computer is OFF. The power of the Station Computer must be set to OFF in this step.
Turn on the power switches of the server panels, GPS time server, modem router for remote
monitoring and Ethernet Switches for the station level equipment.
Figure 3.1.4 GPS Time server (Power ON)
Date and time are displayed when GPS is normally on.
Figure 3.1.3 Server (Power OFF)
22
6F2M2000
The key switch
must be set to
OFF position.