Toshiba GSC1000-C Operation Manual page 244

Substation automation system
Table of Contents

Advertisement

C01Z1 FAN Control
C01Z2 FAN Control
C01Z3 FAN Control
Auto PLC
Bulk control function will work regardless of the operation mode setting (LDC/SAS).
Bulk Run control
Click Run in the Bulk Control
1)
column.
Confirmation dialog is displayed.
Click OK.
2)
All of the PLC logic that is registed
in "Auto PLC" is started. Make sure
that status column of the "Auto PLC"
screen is displayed to all "Run".
Run
Run
Run
243
6F2M2000
PLC logic that is registed
in "User PLC" do not
start.

Advertisement

Table of Contents
loading

Table of Contents