Step 5: Start-up the servers
At first, turn on the power switch (key switch) of server-1 in server panel-1.
Next, turn on the power switch (key switch) of server-2 in server panel-2.
Figure 3.1.10 Log printer
Figure 3.1.11 Server panel -1
26
6F2M2000
Turn on the key
switch