Step 6: Start-up the OWS/EWS
At first, turn on the power switch on the OWS/EWS desk.
Second, press the power button on the monitor.
 Power ON: Green LED is on.
Third, open the front door of the OWS/EWS and press Power SW.
 Power ON: Power LED is on.
Figure 3.1.13 OWS/EWS desk (Power SW)