Toshiba GSC1000-C Operation Manual page 84

Substation automation system
Table of Contents

Advertisement

6) Execute becomes active.
Click Execute.
Control command is sent to the BCU/BCPU.
8)
When the control is completed successfully,
the device symbol on the bay single line
diagram changes to SET status and the
"Control" dialog is closed.
9)
If the control fails, an error message is
displayed in the "Control" dialog. Check the
error message and click Close to close the
dialog.
83
6F2M2000

Advertisement

Table of Contents
loading

Table of Contents