Install end covers
Install the left end cover on the left side of the power supply module, see
"Installing end covers", page 36.
Install the right end cover on the right side of the 4-channel EnDat module, see
"Installing end covers", page 36.

10.2.12 Connect the encoders

Connect the 1 V
Connect the 1 V
see "Connecting a 1 VPP encoder", page 44.
Connect the EnDat encoder
Connect the EnDat encoder to the MSE 1314 (ID 747503-01) X11 connector 16,
see "Connecting an EnDat encoder", page 43.

10.2.13 Secure the cables

Install cable mounting hardware
Install the cable mounting hardware provided with each module, see "Installing
cable mounting hardware", page 36.
Secure cables
Secure all cables to the cable mounting hardware using the supplied cable tie's.

10.2.14 Power-up the modules

Power-up
Press the On (supply) side of the power switch to power-up the system, see
"Initial power-up", page 48.
134
encoder
PP
encoder to the MSE 1184 (ID 747500-01) X1 connector 17,
PP
HEIDENHAIN | MSE 1000 | Operating Instructions | 10/2015

Advertisement

Table of Contents
loading

Table of Contents