Installation And Commissioning Examples; Example Using Dhcp Ip Address Assignment; Mount The Modules - HEIDENHAIN MSE 1000 Operating Instructions Manual

Table of Contents

Advertisement

10

Installation and commissioning examples

Each MSE 1000 system is unique, but the installation and commissioning of most
systems is similiar.
Install the MSE 1000 system
Configure the MSEsetup software
Configure the network communication settings
Setup the modules
Setup the encoders
10.1

Example using DHCP IP address assignment

The following information provides an example for how to install and commission
an MSE 1000 system with three modules and two encoders using DHCP IP
address assignment.
MSE 1000 modules with encoders:
MSE 1201 (ID 747501-01) AC 120 V power supply module
MSE 1184 (ID 747500-01) 1 V
MSE 1314 (ID 747503-01) 4-channel EnDat module with one AT 1217 length
gauge
10.1.1

Mount the modules

Mount power supply module
Mount the MSE 1201 (ID 747501-01) power supply module, see "Mounting a
module", page 34.
Mount base module
Mount the MSE 1184 (ID 747500-01) 1 V
module", page 34.
Connect power supply and base module
Connect the power supply module and the base module, see "Connecting
modules", page 35.
Mount EnDat module
Mount the MSE 1314 (ID 747503-01) 4-channel EnDat module, see "Mounting a
module", page 34.
Connect base and EnDat module
Connect the base module and the 4-channel EnDat module, see "Connecting
modules", page 35.
HEIDENHAIN | MSE 1000 | Operating Instructions | 10/2015
Example using DHCP IP address assignment
base module with one ST 128x length gauge
PP
base module, see "Mounting a
PP
10
10.1
125

Advertisement

Table of Contents
loading

Table of Contents