Hitachi ZA3000 Series Instruction Manual page 129

Polarized zeeman atomic absorption spectrophotometer
Table of Contents

Advertisement

Fig. 5-11 Existing Working Curve Confirmation Window
(5)
Clicking the [Working Curve Preview] button presents a list
of working curves copied. Then, when a working curve
corresponding to the analyte element is double-clicked, the
Working Curve Detail dialog box will open. In this dialog
box, check the conditions of the working curve concerned.
(6)
Click the [Verify] button and start measurement.
NOTE:
Since the atomic absorption photometry is subject to
constant changes of sensitivity, use the existing
working curves measured as recently as possible.
5 - 13
5.4

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents