Replacing The Intellistart Fluidics Tubing; Replacing Intellistart Fluidics Tubing (Standard Configuration); Intellistart Fluidics System Physical Layout - Waters Xevo G2-XS QTof Overview And Maintenance Manual

Hide thumbs Also See for Xevo G2-XS QTof:
Table of Contents

Advertisement

7.33 Replacing the IntelliStart Fluidics tubing

In the event of a blockage in the tubing connections between the IntelliStart Fluidics system
components, you must replace the tubing. The following procedures explain how to replace the
tubing for the LockSpray and sample delivery systems. They do not address probe connections,
which vary according to your application. For probe connection instructions, see the relevant
procedure:
• For the ESI probe, see
• For the IonSABRE II probe, see
Fit tubing according to one of these two plumbing configurations:
• LockSpray standard configuration (see
configuration) (Page
• NanoLockSpray configuration (see
NanoLockSpray operation (Page
7.34 Replacing IntelliStart Fluidics tubing (Standard
configuration)

7.34.1 IntelliStart fluidics system physical layout

The flow sensor and grounded union are optional fittings if you fit the LockSpray source. They are
standard fittings if you fit the NanoLockSpray source.
Tip:
Tubing connections are omitted for clarity.
Configuring for ESI mode (Page
Configuring for APCI mode (Page
217).
Plumbing the sample fluidics delivery system for
59)).
March 31, 2021, 715004496 Ver. 04 (previously released as Rev. D)
44).
Replacing IntelliStart Fluidics tubing (Standard
Page 217
48).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents