Waters Xevo G2-XS QTof Overview And Maintenance Manual page 166

Hide thumbs Also See for Xevo G2-XS QTof:
Table of Contents

Advertisement

Figure 7–75: Inserting the nickel gasket
Nickel gasket
ESI probe tip
Stainless steel tube
24. Carefully slide the probe tip onto the ESI probe, ensuring that the capillary feeds through
the stainless steel tube inside the probe tip.
25. Screw the probe tip onto the ESI probe assembly.
26. Tighten the probe tip using the 7-mm wrench and the 10-mm wrench, as shown in the
following figure.
Figure 7–76: Securing the probe tip
10-mm wrench
Probe tip
ESI probe
7-mm wrench
Important:
To avoid gas leakage, fully tighten the probe tip.
March 31, 2021, 715004496 Ver. 04 (previously released as Rev. D)
Page 166

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents