Waters Xevo G2-XS QTof Overview And Maintenance Manual page 236

Hide thumbs Also See for Xevo G2-XS QTof:
Table of Contents

Advertisement

Figure 7–152: Fitting the PEEK adapter
Flangeless nut
Flangeless ferrule
PEEK female-to-male adapter
d. Slide the transparent, 1/16-inch, flangeless nut and blue, 1/16-inch, flangeless
ferrule over the tubing.
Rationale:
These components provide fail-safe pressure relief in the event of a
blockage.
e. Insert the tubing in the female-to-male adapter in port 7 and tighten the fittings.
3. Using a long, finger-tight fitting, connect 1/16-inch, 1,000-mm, natural-colored PEEK tubing
to port 1 of the sample selector valve and thread the tubing into the waste port.
Figure 7–153: Connecting the sample selector valve to the waste port
A
A
B
B
C
C
Waste port
Figure 7–154: Long, finger-tight fitting
Tip:
The liquid waste system collects waste without requiring a fitted connection. Waste
drains through the connector at the base of the instrument and into the waste bottle. See
Connecting liquid waste lines (Page
4. Using a long, finger-tight fitting, connect orange, 1/16-inch, 1,000-mm PEEK tubing from
port 2 of the sample selector valve to the wash bottle.
March 31, 2021, 715004496 Ver. 04 (previously released as Rev. D)
B
C
A
Wat ers
B
C
A
271).
Page 236

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents