Waters Xevo G2-XS QTof Overview And Maintenance Manual page 153

Hide thumbs Also See for Xevo G2-XS QTof:
Table of Contents

Advertisement

6. Dispose of the nickel gasket in accordance with local environmental regulations.
Warning:
care.
7. Remove the slide port assembly from the probe assembly by pulling the PEEK union.
Figure 7–57: Removing the slide port assembly
PEEK union
Slide port assembly
Capillary
ESI Probe
Note:
The capillary is attached to the slide port, and is removed with the coupling.
8. Unscrew and remove the knurled nut from the slide port, and remove the conductive liner
tube from inside the knurled nut.
Figure 7–58: Removing the conductive liner tube
PEEK union
Slide port
Conductive liner tube
March 31, 2021, 715004496 Ver. 04 (previously released as Rev. D)
To avoid puncture wounds, handle sharp parts and materials with
Page 153

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents