Shift Cable Installation - Mercury 25 EFI Service Manual

Hide thumbs Also See for 25 EFI:
Table of Contents

Advertisement

Outboard Installation
9.
Tighten the cable barrel retainer bolt to the specified torque.
a
Description
Cable barrel retainer bolt
10. Install the access cover and secure with three bolts. Tighten bolts to the specified torque.
Description
Access cover bolt (3)

Shift Cable Installation

If not properly installed, the reverse gate can interfere with water coming off the rudder, suddenly and unexpectedly slowing
the boat. This can cause serious injury or death from occupants being thrown within or out of the boat. Adjust the shift cable
to prevent the reverse gate from interfering with water flow off the rudder.
1.
Attach the shift cable to the shift cam with a flat washer and a self‑locking nylon insert locknut as shown. Tighten the
locknut against the flatwasher, then back‑off the locknut 1/4 turn.
2.
Place the remote control handle into full forward position.
3.
Adjust the shift cable adjustment barrel so that the roller is at the full end of travel (bottom) in the shift cam.
Page 1D-20
c
b
a -
b -
c -
24903
WARNING
!
© 2016 Mercury Marine
Cable barrel retainer
Cable barrel retainer bolt
Cable grommet
Nm
Nm
10
90-8M0105568 eng MARCH 2016
lb. in.
lb. ft.
6
53
15858
lb. in.
lb. ft.
88

Advertisement

Table of Contents
loading

This manual is also suitable for:

30 efi25 efi jet

Table of Contents