Mercury 25 EFI Service Manual page 496

Hide thumbs Also See for 25 EFI:
Table of Contents

Advertisement

Tiller Handle
2.
Install the throttle to the throttle arm and install the washer and cotter pin.
f
a -
Marks aligned in neutral position
b -
Control cable jam nuts
c -
Throttle opener
d -
Throttle rod
e -
Cotter pin and washer
f -
Throttle arm
3.
Route the lanyard stop switch and tiller handle stop button wires and shift/throttle cables through the grommet.
4.
Install the lower cowl cover.
a
e
d
Page 7B-24
e
d
b
© 2016 Mercury Marine
c
a -
Lanyard stop switch and tiller handle stop button
wires
b -
Reverse shift/throttle cable
c -
Forward shift/throttle cable
d -
Grommet
e -
Lower cowl cover
c
18104
a
b
b
18095
90-8M0105568 eng MARCH 2016

Advertisement

Table of Contents
loading

This manual is also suitable for:

30 efi25 efi jet

Table of Contents