4.
Install the IAC hoses to the IAC. Secure IAC hoses to the IAC with spring clamps.
a
a -
IAC hoses
b -
Upper IAC bracket bolts and washers (2)
c -
Lower IAC bracket bolts and washer (1)
Description
IAC bracket bolt
5.
Install the support bracket to the electrical bracket.
6.
Secure the support bracket to the electrical bracket with a bolt and washer. Tighten the bolt to the specified torque.
Description
Support bracket bolt
7.
Secure the support bracket to the electrical bracket with a bolt and washer. Tighten the bolt to the specified torque.
8.
Install the two solenoid ground wires and the starter relay ground wire onto the support bracket bolt. Secure the support
bracket with the bolt and ground wires. Tighten the bolt to the specified torque.
90-8M0105568 eng MARCH 2016
b
© 2016 Mercury Marine
Service Procedures
a
c
10598
Nm
lb. in.
6
53
20898
Nm
lb. in.
6
53
Page 3C-51
lb. ft.
lb. ft.