Gilson 155 User Manual page 101

Uv/vis detectors
Table of Contents

Advertisement

Maintenance
4-10
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
To clean and insert flow cell:
1
To clean the existing or replacement flow cell
before installing it, dampen the quartz windows
with alcohol or a laboratory cleaning solution.
Then wipe the windows with a piece of lens
paper or lint-free towel.
2
Clean the inside of the flow cell mounting area
with a lint-free towel soaked in alcohol.
3
Carefully dry all surfaces of the assembly.
4
Without touching the quartz windows, insert
the flow cell into its chamber. Push the cell into
the chamber as far as it will go. A poorly
aligned flow cell may restrict or block flow.
To tighten the fittings:
1
Tighten the stainless steel screw into the left
side of the flow cell assembly.
2
Finger tighten the outlet (top) fitting.
3
Finger tighten the inlet (bottom) fitting.
4
Turn the outlet fitting an additional 1/16 turn
using pliers.
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

156

Table of Contents