Installation; Overview; Safety First; Facility Requirements - Nordson Asymtek Spectrum Series Installation, Operation & Maintenance Manual

Dispensing system
Table of Contents

Advertisement

3

Installation

3.1

Overview

This section describes installation procedures for the Spectrum Series S-920 Dispensing System and
covers the following topics:
Uncrating and Placing the Dispensing System
Unpacking the Dispensing Chamber
Leveling the Dispensing System
Leveling the Scale
Setting Up the Service Station
Installing the Light Beacon
Installing the Laptop Computer
Installing the Camera
Anchoring the Dispensing System
3.2

Safety First

Operation of your S-920 Dispensing System involves heat, air pressure, electrical power, mechanical
devices, and the use of hazardous materials. It is essential that every person servicing or operating the
dispensing system fully understands all hazards, risks, and safety precautions. Refer to
for additional information.
CAUTION!
Installation procedures should only be performed by a trained service technician.
3.3

Facility Requirements

To ensure optimal performance and safety, it is necessary to install the dispensing system in a facility that
meets the requirements. If you have any questions about facility requirements, please contact Asymtek
Technical Support. See
3.4

Tools and Materials Needed

3 mm hex key
9/16-inch wrench
Band Cutter
Personal Protective Equipment
Hammer
Flat Bar
Installation
10.2 Facility Requirements
for detailed information.
1/2-inch wrench
Phillips Screwdriver (included in tool kit)
1 ½-inch wrench (included in tool kit)
Diagonal-cut pliers
Forklift
Box Level
Section 2 - Safety
3-1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Asymtek Spectrum Series and is the answer not in the manual?

This manual is also suitable for:

Asymtek spectrum s-920

Table of Contents

Save PDF