Connecting The Power And Air Supply; Figure 4-1 Main Power Circuit Breaker And Cable - Nordson Asymtek Spectrum Series Installation, Operation & Maintenance Manual

Dispensing system
Table of Contents

Advertisement

4.4

Connecting the Power and Air Supply

CAUTION!
Tools and Materials Needed
Main Power Cable
Facility Air Hose
To connect the system to facility power:
1. Locate the main power cable, included in the accessories crate.
2. Plug the female end of the power cable into the main power inlet on the rear of the dispensing
system (Figure 4-1).
CAUTION!
3. After making sure the main circuit breaker is OFF, plug the male end of the power cable into
the facility power source.
1
2
Item
1
Main Circuit Breaker
2
Main Power Cable
4-2
The following procedures should only be performed by a trained
service technician.
Make sure that the Main Circuit Breaker is in the OFF (0) position before
connecting the dispensing system to the facility power source.

Figure 4-1 Main Power Circuit Breaker and Cable

Description
Power-Up and Testing

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Asymtek Spectrum Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Asymtek spectrum s-920

Table of Contents

Save PDF