Power-Up And Testing; Overview; Safety First; Facility Requirements - Nordson Asymtek Spectrum Series Installation, Operation & Maintenance Manual

Dispensing system
Table of Contents

Advertisement

4

Power-Up and Testing

4.1

Overview

Once you have performed installation of the accessories, you are ready to power up and functionally test
the dispensing system. This section covers the following topics:

Safety First

Facility Requirements

Connecting the Power and Air Supply
Powering on the Dispensing System
Starting Fluidmove for Windows (FmXP)
FmXP Configuration
Exiting Fluidmove for Windows (FmXP)
Preliminary System Check
Component-Level Functional Tests
System-Level Functional Test
4.2
Safety First
Operation of your S-920 Dispensing System involves heat, air pressure, electrical power, mechanical
devices, and the use of hazardous materials. It is essential that every person servicing or operating the
dispensing system fully understands all hazards, risks, and safety precautions. Refer to
for additional information.
4.3
Facility Requirements
To ensure optimal performance and safety, it is necessary to install the dispensing system in a facility that
meets the requirements. If you have any questions about facility requirements, please contact Asymtek
Technical Support. See
Power-Up and Testing
10.2 Facility Requirements
for detailed information.
Section 2 - Safety
4-1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Asymtek Spectrum Series and is the answer not in the manual?

This manual is also suitable for:

Asymtek spectrum s-920

Table of Contents

Save PDF