Leveling The Scale; Figure 3-11 Leveling The Scale; Figure 3-12 Replacing The Scale Cover - Nordson Asymtek Spectrum Series Installation, Operation & Maintenance Manual

Dispensing system
Table of Contents

Advertisement

3.8

Leveling the Scale

1. Check the scale level bubble.
If the bubble is not centered, the scale must be leveled. If the bubble is centered, the scale
is level.
2. Adjust the scale leveling screws until the scale is level (Figure 3-11).
Leveling Screws
3. Replace the scale cover and reinstall the two mounting screws (Figure 3-12).
3-10

Figure 3-11 Leveling the Scale

Figure 3-12 Replacing the Scale Cover

Bubble
Installation

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Asymtek Spectrum Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Asymtek spectrum s-920

Table of Contents

Save PDF