Nordson Asymtek Spectrum Series Installation, Operation & Maintenance Manual page 107

Dispensing system
Table of Contents

Advertisement

After the program has been loaded, the filename will appear in the Current Program
section of the Production Window.
j.
In the Production Window, click on the
Dry Run
The Run Window will open.
Power-Up and Testing
Figure 4-27 Program Open Window
in the area below the Run Production button.
Figure 4-28 Run Window
button and then double click on
Run
Single
4-41

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Asymtek Spectrum Series and is the answer not in the manual?

This manual is also suitable for:

Asymtek spectrum s-920

Table of Contents

Save PDF