Nordson Asymtek Spectrum Series Installation, Operation & Maintenance Manual page 106

Dispensing system
Table of Contents

Advertisement

3. Click on
Run to End
4. Once you have completed the Scripted Valve Offsets routine, perform a simulated (dry)
production run using the TS-01 Test Box as follows:
NOTE If your system is equipped with substrate heaters, make sure the heaters have
a. Perform a service shutdown as specified in
b. Attach the TS-01 upstream and downstream cable adapters to the TS-01 I/O Test Box.
c. Attach the TS-01 upstream and downstream cables to the appropriate SMEMA
connectors at the rear of the dispensing system.
d. Start the dispensing system as specified in
e. Make sure that all of the
are all set to
f.
Make sure that the
set to
OPTO I/O
g. In the FmXP Main Window, click on
h. In the Production Window, click on
i.
Select a dispensing program from the list and click on
4-40
Figure 4-26 Machine Setup Dialog Box
to perform the offsets routine.
reached the set point temperature (SP) before proceeding with this procedure.
I↔O/INDEP
.
INDEP
DRIVERS/OPTO I/O
.
2.11 Service
Shutdown.
4.5 Powering on the Dispensing
switches along the edge of the TS-01 I/O Test Box
switch in the corner of the TS-01 I/O Test Box is
.
Run a Program
.
Load
Open
System.
. See Figure 4-27.
Power-Up and Testing

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Asymtek Spectrum Series and is the answer not in the manual?

This manual is also suitable for:

Asymtek spectrum s-920

Table of Contents

Save PDF