To setup the heater tooling in Fluidmove:
WARNING!
1. In the Fluidmove Main Window, click on
2. In the Production Window (Figure 6-15), click on
.
Heater 2
The Heater Control Window (Figure 6-16) will open.
3. In the Heater Control Window (Figure 6-16), locate the loop (channel) for the desired heater.
6-20
The heater may be hot. Avoid touching heater surfaces or burn injury may occur.
Figure 6-15 Fluidmove Production Window
.
Run a Program
and in the list box select
Setup
Setup
Operation
Need help?
Do you have a question about the Asymtek Spectrum Series and is the answer not in the manual?