Plc Commissioning - Siemens SINUMERIK 840DiE sl Manual

Hide thumbs Also See for SINUMERIK 840DiE sl:
Table of Contents

Advertisement

5 Power On and Power–Up
5.2 First power–up
Completion
5.2.2
Basic commissioning of the PLC
5-110
Notice
You must not switch off the PCU during the entire installation procedure. Data
loss!
S
Install on NEXT REBOOT
None of the listed applications are installed and you are taken to the Win-
dows desktop. The installation menu is displayed again the next time the
PCU is booted.
S
CANCEL installation
None of the listed applications are installed.
Application:
Subsequent installation of a hard drive image as part of a standard commis-
sioning.
Notice
The current installation menu will not be displayed the next time the PCU is
booted. The installation procedure which was cancelled with "Cancel
installing" cannot be repeated
When installation is complete rebooting automatically starts. Once the PCU has
booted again, you can continue with the basic PLC commissioning (Section
5.2.2, Page 5-110).
Once the Service Desktop is active the PLC series startup file supplied must be
loaded into the PLC for basic commissioning. To do so, proceed as follows:
1. Start the "SinuCom NC" commissioning tool from the Windows taskbar:
Start > Programs > SinuCom NC > SinuCom NC
2. Use SinuCom NC to load the series startup file PLC_SMP.ARC into the
PLC.
Menu command: File > Archive > Series commissioning archive > Read in
Dialog box: Reading–in an archive
– Radio button: Data Storage
– Button: "NEXT"
– Select file PLC_SMP.ARC in directory Archive
– Button: "FINISH".
This executes the PLC basic commissioning. NC and PLC run in cyclic mode.
© Siemens AG 2007 All Rights Reserved
SINUMERIK 840Di sl Manual (HBIsl) – 01/2007 Edition
01/2007

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinumerik 840di sl

Table of Contents