Reinstalling Components In The Mx960 Chassis After Installing It With A Lift - Juniper MX960 Hardware Manual

Universal routing platform
Hide thumbs Also See for MX960:
Table of Contents

Advertisement

Figure 103: Dressing the Cables Through the Routing Channels
Reinstalling Components in the MX960 Chassis After Installing It with a
Lift
After the router is installed in the rack, reinstall the removed components before booting and configuring
the router. You reinstall components first in the rear of the chassis, and then in the front:
Reinstalling the Power Supplies After Installing the MX960 Router with a Lift | 321
1.
Reinstalling the Fan Trays After Installing the MX960 Router with a Lift | 324
2.
Reinstalling the SCBs After Installing the MX960 Router with a Lift | 326
3.
Reinstalling the DPCs After Installing the MX960 Router with a Lift | 327
4.
Reinstalling the FPCs After Installing the MX960 Router with a Lift | 329
5.
Reinstalling the Standard Cable Manager After Installing an MX960 Router with a Lift | 330
6.
320

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents