Juniper MX960 Hardware Manual page 203

Universal routing platform
Hide thumbs Also See for MX960:
Table of Contents

Advertisement

Table 80: MX960 Site Preparation Checklist
Item or Task
Verify that environmental factors such as
temperature and humidity do not exceed
router tolerances.
Select the type of rack or cabinet.
Plan rack or cabinet location, including
required space clearances.
If a rack is used, secure rack to floor and
building structure.
Acquire cables and connectors.
Locate sites for connection of system
grounding.
Measure distance between external power
sources and router installation site.
Calculate the optical power budget and
optical power margin.
RELATED DOCUMENTATION
Installing an MX960 Router Overview | 263
Unpacking the MX960 Router | 249
For More Information
"MX960 Router Environmental
Specifications" on page 180
"MX960 Cabinet Size and
Clearance Requirements" on
page
187,
"MX960 Rack Requirements" on
page 183
"MX960 Cabinet Size and
Clearance Requirements" on
page
187,
"MX960 Rack Requirements" on
page
183,
"Clearance Requirements for
Airflow and Hardware
Maintenance for the MX960
Router" on page 185
"MX960 Rack Requirements" on
page 183
"MX960 Router Grounding
Specifications" on page 197
"Calculating Power Budget and
Power Margin for Fiber-Optic
Cables" on page 191
Performed By
Date
182

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents