Juniper MX960 Hardware Manual page 401

Universal routing platform
Hide thumbs Also See for MX960:
Table of Contents

Advertisement

3. Slide the Switch Control Board into the chassis until you feel resistance, carefully ensuring that it is
correctly aligned.
4. Grasp both ejector handles, and rotate them simultaneously clockwise until the Switch Control Board
is fully seated.
5. Place the ejector handles in the proper position, horizontally and toward the center of the board.
Figure 138: Installing a Switch Control Board in the MX480
6. Check the LEDs on the Switch Control Board faceplate to verify that it is functioning normally.
The green OK/FAIL LED should light steadily a few minutes after the Switch Control Board is installed.
If the OK/FAIL LED is red, remove and install the Switch Control Board again. If the OK/FAIL LED
still lights steadily, the Switch Control Board is not functioning properly. Contact your customer
support representative.
7. Check the status of the Switch Control Board using the show chassis environment cb command:
user@host> show chassis environment cb
CB 0 status:
State
Temperature
Power 1
1.2 V
1.5 V
1.8 V
2.5 V
3.3 V
5.0 V
12.0 V
1.25 V
Online Master
25 degrees C / 77 degrees F
1198 mV
1508 mV
1830 mV
5059 mV
6593 mV
5111 mV
12181 mV
1250 mV
388

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents