4. Grasp both ejector handles, and rotate them simultaneously clockwise until the SCB is fully seated.
5. Place the ejector handles in their proper position, vertically and toward the center of the board. To
avoid blocking the visibility of the LEDs position the ejectors over the PARK icon.
Figure 109: Reinstalling an SCB
Reinstalling the DPCs After Installing the MX960 Router with a Lift
To reinstall a DPC (see
Figure 110 on page
1. Wrap and fasten one end of the ESD grounding strap around your bare wrist, and connect the other
end of the strap to the ESD point on the chassis.
2. Take each DPC to be installed out of its electrostatic bag, and identify the slot on the DPC where it
will be connected.
3. Verify that each fiber-optic DPC has a rubber safety cap covering the transceiver. If it does not, cover
the transceiver with a safety cap.
328):