FC 300 Design Guide
IP 21/Type 1 (NEMA 1) Enclosure Kit
"
A - Top cover
B - Brim
C - Base part
D - Base cover
E - Screw(s)
Place the top cover as shown. If an A or B option
is used the brim must be fitted to cover the top
inlet. Place the base part C at the bottom of the
drive and use the clamps from the accessory bag
to correctly fasten the cables. Holes for cable
glands:
Size A2: 2x PG16 (½") 3xPG21 (3/4")
Size A3: 3xPG16 (½") 3xPG21 (3/4")
84
How to Install
MG.33.B3.22 - VLT is a registered Danfoss trademark
Need help?
Do you have a question about the VLT AutomationDrive FC 300 and is the answer not in the manual?
Questions and answers