Siare Morpheus Series User Manual page 135

Anesthesia unit
Hide thumbs Also See for Morpheus Series:
Table of Contents

Advertisement

Preparation to use
Conclusions
6-50
Before connecting a patient to the anaesthesia unit it is necessari to
perform and overcome all the preliminary tests.
If the preliminary tests phase is not overcome:
see cfr. 8 (Alarms) and cfr. 9 (Troubleshooting);
contact the nearest Siare Service Center or authorize by Siare.
WARNING! ! Risk of injuries for the patient
Before connecting a patient to the anaesthesia unit check the alarms
set vlaues (cfr. 8).
Modify the alarms settings in function of clinical situation.
WARNING! ! Risk of injuries for the user / patient
The MORPHEUS LT/MRI anaesthesia unit must be inspected and
maintained once the 1000 hours operation are reached or, in case of
limited use, every 6 months at least.
All maintenance interventions and/or repairing require a perfect
knowledge of equipment, so they must be effected by highly
qualified, specifically trained personnel, formally authorized by
SIARE.
Inadequate interventions or not authorized modifications can
compromise safety and be dangerous for the patient.
MORPHEUS MRI

Advertisement

Table of Contents
loading

This manual is also suitable for:

Morpheus lt/mri

Table of Contents