Preparation to use
During the " SELF TEST " phase the system verifies
Gas supply
Pressure sensor
Battery
Oxygen cell
6-30
After checks of displays and leds il ventilator proceeds with " SELF
TEST " and displays:
•
tESt
( execution of electronic test phase)
•
2.5
( release of installed software )
•
0006
(operation hours)
Verification of the presence of Air and O 2 supply
pressure
Verification of pressure sensor operation through control
of PAW reading
Checking on battery power
Verification of O 2 cells connection in the valves group
MORPHEUS MRI