Installation Requirements; Space Requirements; Power Requirements - Mindray BC-2800 Operator's Manual

Auto hematology analyzer
Hide thumbs Also See for BC-2800:
Table of Contents

Advertisement

4.2 Installation Requirements

Before installation, you should ensure that the following space, power and environmental
requirements are met.

4.2.1 Space Requirements

Check the site for proper space allocation. In addition to the space required for the analyzer
itself, arrange for
at least 28 cm on each side, which is the preferred access to perform service
procedures;
at least 10 cm behind for cabling and ventilation;
enough room on or below the countertop to accommodate the diluent, rinse and waste
containers.

4.2.2 Power Requirements

Check the availability of a power outlet that meets the following requirements
Voltage: 100 to 240 VAC;
Frequency: 50/60±1 Hz
Power: 180VA
Fuse: 250V T4A
Make sure the analyzer is properly grounded.
Replace fuse only with the type and rating specified.
Make sure the electrical outlet meets the requirements.
Before connecting the power cord, make sure the power switch at the back
of the analyzer is placed in the off (O) position.
Installing Your Analyzer
4-2

Advertisement

Table of Contents
loading

Table of Contents

Save PDF